Standard Notes & Exclusions – CTX Modular Buildings

  • No inclusion for Cranage. (unless stated above)
  • For installations/dismantles using a “Hiab” style vehicle we have not included for a site specific lifting plan. If required this would be provided by a 3rd party and the cost will be passed to the customer.
  • Delivery and erection prices are based on normal working hours Monday to Friday. Outside these times will incur additional costs.
  • For CTX/modular installs a lay-down area is to be provided for both installation and removal.
  • Foundations by others. Full details will be provided.
  • Landscaping,/ramps and pathways by others.
  • No inclusion has been made for any specialist requirements with regards to roof work / working at height. Whilst working at height our methodology is to attach to the off-loading crane via inertia, lanyard and harness and access the roof via footed ladder. Should this method of roof work not be permitted it is at the clients cost to provide other means of access.
  • During the site works we may have the need to use 600 x 300mm “Step Ups” to gain access to internal trims etc, as with all equipment we provide our operatives, our step ups are HSE approved. Should the customer have their own, in-house, regulations which renders our approved equipment un-useable it is the client’s responsibility to provide the equipment to meet their own regulations.
  • No inclusion for IT /Telecom points and cabling (unless specified above.)
  • No inclusion for Fire alarm and emergency lighting. (unless specified above.)
  • No inclusion for the supply and installation of Air conditioning system. (unless specified above.)
  • Skips for removal of debris to be supplied.
  • Any electrical testing over and above the dead test. “Earth Loop Impedance” to be carried out by the connecting engineer.
  • No inclusion made for any additional earthing using the earthing clamps or other methods of lightning conductivity.
  • No inclusion for furniture unless stated above. (Cost can be provided)
  • Installation of skirt to base of units currently not included. Once the height of the foundations and ground fall is ascertained a cost can be provided.
  • It is assumed that adequate parking will be available at the site for the installations team’s vehicles.
  • It is the client’s responsibility to ensure suitable hard standing and site access for articulated vehicles/cranage.
  • Mains connections / disconnections by others.
  • For hire durations in excess of 12mths we reserve the right to pass on any “R.P.I or R.H.A” inflationary increases in collection transport costs. (Retail Price Index / Road Haulage Association)
  • A cleaning charge may be applied at the end of the hire if units require cleaning, a further charge if toilets are returned containing waste.
  • Notice of off-hire, hires of between 10 and 20 CTX bays require a minimum notice period of 2 weeks. For CTX buildings greater than 20 units we require a minimum 4 weeks’ notice.
  • Any additional cost to comply with local planning or building control over and above the standard hire fleet specification or if a sale the specification supplied above to be covered by client. If applying to building control this should be done before placing any orders for the buildings.